ME Model scrap yard Gantry Crane Used In Russia
Technical parameters
|
Main Steel Structure Capacity |
40 Ton |
|
Trolley Capacity |
32t+32t |
|
Span |
35m+5m Cantilever |
|
Lifting Height |
15m |
|
Working Class |
M6 |

How did we do this project?
Dual trolleys with a capacity of 32 tons each are used to tilt the scrap containers. The whole crane bridge is 40 tons. Two separated trolleys on one gantry crane can work together to unload the scrap containers instead of using two mobile cranes. The maximum container weight is 28 tons, but for safety, the capacity of 32 tons is good choice.
The control system: leakage joystick design. Ensure that the two trolleys up and down and move horizontally at the same speed. And it can also control the up and down of one trolley independently.
Besides unloading scrap container, customers can also equip the gantry cranes with 5 CBM grab buckets and capacity 10 tons magnets to handle scrap.
Power supply: we use cooper wire bus bar instead of cable reel. Long service life, and can support 4 sets large-capacity gantry cranes to work at the same time.
The rail we suggest use QU80 rail as the long travelling wheel qty are 8 pcs. The 8 wheels design for long travelling can effectively distribution the wheel load and make gantry crane traveling more smooth and stable. It is a proper and economy choice.

